Sunday, January 26, 2020

The Construction Quality Assessment System Construction Essay

The Construction Quality Assessment System Construction Essay CONQUAS stands for Construction Quality Assessment System. Construction Industry Development Board Singapore now known as the Building and Construction Authority have developed it for the major public sector agencies and the various leading industry professional bodies to measure the quality level of completed project (The National House Buyers Association (HBA), 2009). The Building and Construction Authority (BCA) is an agency under the Singapores Ministry of National Development. The BCA is championing the development of an excellent built environment for Singapore. Built environment refers to buildings, structures and infrastructure in our surroundings that provide the setting for the communitys activities. (Building and Construction Authority, 2006) At the beginning, the CONQUAS was introduced only to the local construction industry. CONQUAS have been launched since 1989 (Building and Construction Authority, 2006). Today, CONQUAS is widely recognized and also accepted internationally as a benchmarking tool for quality. CONQUAS is now a registered trademark. CONQUAS have adapted in Singapore, Malaysia, China, Hong Kong, United Kingdom, Australia, South Africa and India, UK and Hong Kong construction industries (Building and Construction Authority, 2006). The aim of CONQUAS was introduced to have a standard quality assessment system for construction projects. Furthermore, CONQUAS is to enable quality assessment to be carried out systematically within reasonable cost and time. Besides, CONQUAS is used to measure quality of constructed works against workmanship standards and specification (Building and Construction Industry, 2005). However, CONQUAS is an independent assessment. It is carried out by assessors from BCA Singapore. It was designed to gauge and benchmark the quality of workmanship through the sampling approach. On the other hand, it means not every unit will be inspected or evaluated by the assessor. Random samples will be pre-selected and inspected to represent the quality of the whole project (The National House Buyers Association (HBA), 2009). Since the launch of CONQUAS in 1989, more than 2,238 public and private building projects have been assessed by BCA. The total cumulative contract value of the assessed projects exceeds 81.9billion Singapore dollar (Building and Construction Authority, 2006). In 1998, BCA introduced a number of new features to CONQUAS resulting in the launch of CONQUAS 21 (Building and Construction Authority, 2006). Now, Malaysia is applying CONQUAS 21 into the building projects. Problem Statement The standard quality of the building product becomes the significant issue that is always discussed and disputed by the contractors, developers, and investors or house buyers. Quality assessment of the building before the developer vacant possession to the purchaser is the significant issue for the developer. The developer shall delivery the final building product to the purchaser which the building is achieved a standard quality. However, how many will ask: How should I ensure the quality of the product (property) that I purchased is fairly justified with the amount of money that I paid? Many of the investors and the house buyer are sacrificing a huge money to appoint a famous Feng Shui master, to conduct a property surveys and engaged property agent prior making decision to invest the property. Has the quality standard of the building product been assured and same as the show unit? (The National House Buyers Association (HBA), 2009). There are many developers intended to deliver the final product to the end user with free of defects and good in quality. Thus, to achieve the standard quality of the building production, the contractor can adopt the Construction Quality Assessment (CONQUAS 21) in the project to give the quality assurance workmanship of building product. Although, the CONQUAS 21 is applied in construction industry, however, it is brought any benefits to the contractors, developers and end users? Moreover, what are the impact of the CONQUAS 21 toward the contractors, developers and end user? Consequently, the researcher will carry out the research regarding the application of quality assessment system (CONQUAS 21) in construction industry. Aims Objectives Aims To investigate Quality Assessment System (CONQUAS 21) in construction industry. Objectives To study the principle and concept of CONQUAS 21 To find out problems occur when applying the CONQUAS 21 To find out the advantages of using CONQUAS 21 Scope of study The research will provide a detail description on the standard of CONQUAS 21 and procedures of the system. This is done through literature review on journal papers, conference papers, books and browsing through websites. Besides that, the researcher aims to the population of local contractors and developers who are adopted CONQUAS 21 in the construction projects. Researcher will investigate the reason of implementing the CONQUAS 21 in construction industry. Moreover, research will in-deep investigate regard the impacts and advantages of CONQUAS 21. Basically, a case study will be conducted to obtain more information regarding the implementation of CONQUAS 21. Research Methodologies Literature Research Cover journals, relevant textbook, and internet research and conference paper is the sources that I obtain my information and doing for my literature research. Interview Site agent, supervisor and the site manager will be interviewed by the researched to get more details about the CONQUAS 21. The interview is hold at Swiss Garden Residences site. Case Study Site visit to the Swiss Garden Residence would be the best way to figure out the effectiveness of CONQUAS 21. Besides that, it is to figure out the problems occur when applying the CONQUAS 21. Chapter Outline Chapter 1: Introduction In this chapter, the researcher is going to slightly introduce the background of CONQUAS. Besides that, the researcher is going to talk about the aims and objectives for this research. Chapter 2: Literature Review In this chapter, the researcher is going to discuss the concept and principle of CONQUAS 21. The information regarding the CONQUAS 21 are obtained from the literatures from books, articles, journals and web site. Moreover, the researcher is going to comment on the advantages of CONQUAS 21 and the impact of applying the CONQUAS 21. Chapter 3: Designing the case study and research methodology The researcher is going to use Swiss Garden Residences as the case study for CONQUAS 21. The researcher is going to interview the project manager, site manager and site agent for obtaining the relevant information. Chapter 4: Analysis of the secondary data After collecting the information, the researcher is going to do the analysis for the information obtained. The researcher is going to argue on the information obtained and give some opinion regarding the CONQUAS 21. Chapter 5: Conclusion and further studies In this chapter, the researcher is going to make a conclusion for the whole research and state out the further studies for quality assessment. Plan and Schedule Planned Schedule 2009/2010 2010/2011 Second Semester First Semester Second Semester Nov Dec May June July Aug Sep Oct Nov Dec Introduction Literature Review Designing case study Analysis Conclusion Actual Schedule 2009/2010 2010/2011 Second Semester First Semester Second Semester Nov Dec May June July Aug Sep Oct Nov Dec Introduction Literature Review Designing case study Analysis Conclusion Chapter 2 Literature Review 2.1 Quality Philosophy Definition of Quality Different party defines the quality in different way. Some people will define it as to meet contract requirements, instead some people define it as the satisfaction of customer and others also define as it reaches the required standards. Totality of characteristics of an entity that bear on its ability to satisfy stated or implied needs is the definition that The National Organization for Standardization (ISO) defines quality (Chung, 1999). The aims or requirements have been fulfilled or reached by any party, mean the quality standard has been achieved. Furthermore, quality also can be defined based on own opinion such as providing customers with products and services that consistently meet their needs and expectations (S.L. Tang, 2005), performance to the standard expected by the customer (S.L. Tang, 2005) and fitness for purpose (Chung, 1999). However, the definiton of quality is based on how a party to define, it can be defined is several way. Basic Concept of Quality Quality is the most important factor to be concerned in every field including construction field. In order to achieved the quality, the industries have come out with there are assessment system and guidelines to be carried out to ensure the works done in the construction industry can achieve the quality. ISO 9001:2000, Quality Assessment System in Construction (QLASSIC) and Construction Quality Assessment (CONQUAS) is the assessment system that always used by constrction industry to ensure the works done reach the quality standard requirement. Case study of CONQUAS will be carried out in more details later. Quality can be quantified as follows:- Q=P/E Where, Q = quality P = performance E = expectation If Q is greater than 1.0, then the customer has a good feeling about the products or services (Besterfield, 1998). Furthermore, There are nine dimensions in the quality. All dimensions are independent, which means that an end product can be excellent in one dimension but poor in others (Besterfield, 1998). These nine dimensions details and their terms is the following:- Table 1: Nine dimensions of quality and their terms Dimension Terms Performances Primary products/service characteristic such as time, cost and workmanship aspect. Features Secondary characteristic, added consideration such as creativity in design and attractivenes. Conformance Meeting specification or industry standards, workmanship and clients requirement in contract. Reliability Consistency of performance over time, average time for the unit to fail. Durability Useful life period with less maintenance or repair. Service Resolution of problems and complaints, ease of repair. Response Human to human interface such as efficiency during meeting, fast decision making, effective human resources management. Aesthetics Sensory characteristics in design such as exterior finishes. Reputaion Past performance such as being ranked first in the tendering process. Adapted from Garvin, 1988, Managing Quality: The strategic and Competitive Edge, New York: Free Press. Furthermore, there are always the relationship between quality with cost, value, cycle time and productivity. The details of the relationship is shown as following:- Quality and Productivity Productivity increase will influence the quality by improvement Productivity = Salcable output / Resources used Quality and Costs Cost will increase if the quality of conformance increase Cost will increase if the quality of design increase Quality and Cycle Time The cycle time will be reduce if there is improvement of quality effort The cycle time to complete the activities is the key parameter Quality and Value Organizations must evalute the value they provide, relative to the competition Value = Quality / Price (S.L. Tang, 2005) 2.1.3 Quality Management Quality management will influence the quality directly. The principles of quality management are applicable to every industry, within all organisations and at every level (McCabe, 1988). The basic goal of quality management is the elimination of failure: both in the concept and reality of products, services and processes (Juran, 1989). The quality management is defined as all activities of the overall management function that determine the quality policy, objectives and responsibilities, and implement them by means such as quality planning, quality control, quality assurance, and quality improvement within the quality system (McCabe, 1988) The quality management have four stages in evolution, known as: Quality Inspection, Quality Control (QC), Quality Assurance (QA) and Total Quality Management (TQM) (UTM, 2003). Inspection and Quality Control are retrospective; their aim is find out the occurred problem by detection mode. Instead, the aim of Quality Assurance and Total Quality Management is reduce and to avoid problems occuring (McCabe, 1988). The characteristic of the different stages in Quality Management as shown following:- Figure 1: The four stages of quality management TQM QA QC Inspection Adapted from Dale, Boaden and Lescelles 1994: Levels of total quality management adoption Figure 2: The four stages of quality management Quality Assurance Quality systems development Advanced quality planning Comprehensive quality manuals Use of quality costs Involvement of non-production operations Failure mode Total Quality Management Policy deployment Involve suppliers and customers Involve all operations Process management Performance management Teamwork Employee involvement Quality Control Develop quality manual Process performance data Self-inspection Product testing Basic quality planning Use of basic statistics Paperwork controls Inspection Salvage Sorting, grading, relending Corrective actions Identify sources of non-conformance Adapted from Steven McCabe 1988: Quality Improvement Techniques in Construction Stage 1 : Inspection The first stage of quality management is inspection. The inspection is defined as activity such as measuring, examining, testing or gauging one or more characteristics of an entity and comparing these results with specified requirements in order to establish whether conformity is achieved for each characteristic (McCabe, 1988). Inspection is used by most of the construction industry to ensure the conformance. The site supervisor will carried out the inspection of the construction project. The supervisor will make the comparison the architectural works and structural based on the specification and drawing. If there is any defective works found by the customers, the contractor need to rectify the defective works until fulfill the customers requirement. Stage 2 : Quality Control (QC) Quality control will be carried out after the inspection done. Quality control is considered as a system of routine technical activities, to measure and control the quality of the inventory as it is being developed (Mangino, 1996). The procedure of Quality control is very complicated. QC mostly is based on the statistical analysis. Collection of data is required in QC to maintain the quality by statistical techniques. Stage 3 : Quality Assurance Quality assurance is defined as all the planned activities implemented within the quality system, and demonstrated as needed, to provide adequate confidence that an entity will fulfill requirements for quality (McCabe, 1988). The objective of Quality Assurance (QA) is to provide adequate confidence that a service or product will fulfill customers requirement by performing system audit, Failure Mode and Effect Analysis, design of experiment and similar initiatives (UTM, 2003). In other words, QA is more specified on planning. The prevention of poor quality and defects is based on detection activities. Stage 4 : Total Quality Management The final stage of quality management is Total Quality Management. The implementation and understanding of quality management principles and concepts in every aspect of business activities are involved in this stage. The best service or product will be provided to the customer at the lower cost by using these activities. However, TQM is less formal; having either procedures or system, and it is hard to be described due to it is less in formality (McCabe, 1988). Normally, only guidance will be provided by TQM and it consider as a philosophy. Concept and Principles of CONQUAS 21 2.2.1 Introduction Recently, the requirement of customers towards the building that they purchase is quality. They wish to get the best quality of the purchase building as possible. In this condition, the developers have to play an important role to ensure the quality of the building project. The developers overcome the problem by using Quality Assurance (QA) and Quality Control (QC) into the construction project to maintain the standard of quality as the requirement. CONQUAS 21, ISO 9001:2000, QLASSIC will become the choice for the developers for their assessment system. Case study about CONQUAS 21 will be carried out by the researcher in more details. 2.2.2 Objectives of CONQUAS 21 There are three objectives in the CONQUAS 21 system: Act as a standard quality assessment system in construction projects. Inspecting quality assessment by: Measuring the specification and standard of the workmanship in the works done Randomly selecting the sample as represent the whole project To enable quality assessment systematically take place within reasonable cost and time (Building and Construction Authority (BCA), 2006) Scope of CONQUAS 21 In CONQUAS 21 system, all the works done will be given points based on the quality standard. All of the given points will be added together to get the total quality score which also known as CONQUAS score for the construction project (Building and Construction Authority (BCA), 2006). The quality workmanship is better, the higher of CONQUAS score will be obtained. 100% is the maximum CONQUAS score in construction project, but our human being is unable to construct a work with zero-defects. The general building works is covered by CONQUAS 21 system. There are 3 components in the assessment: Structural Works Architectural Works and Mechanical Electrical (ME) Works There are different item to be assessed in the different component stated above (Building and Construction Authority , 2005). CONQUAS 21 is considered as first time right inspection approach (Building and Construction Authority , 2005) means that the rectification works will not take into consideration in CONQUAS 21 score for the assessment. Furthermore, sampling system is the assessment system used in the CONQUAS. The assessor will choose the unit according to the average, 1-in-4 apartment units in a residential development for the assessment (Building and Construction Authority , 2005). Thus, which unit will be chosen is unknown so the contractors have to ensure all of the constructed works are in good quality condition. If there is any defective found, the works will be considered as failed. Besides, the heavily equipment-base such as heavy foundation, sub-structure works and piling is not available for assessment and the work separate contracts or sub-contracts are not included in the assessment (Building and Construction Authority (BCA), 2006). The inspection is different with the inspection done by the site supervisor. Normally, the contractors have to purposely do an arrangement for the inspection which form a specific team for the inspection. There is a guideline have to be followed for the assessment. Components to be assessed Structural Works, Architectural Works and ME Works are the components under CONQUAS 21 assessment. Structural Works Structural Works can be considered as body for a building, the stability of the building will be affected if there is failure or defect in structural works. Thus, maintain its quality is necessary due to the cost of rectification is very expensive. Below show the details of the assessment of Structural Works:- Inspection of finished concrete, formwork and steel reinforcement have to be carried out on site during the construction site. If any component constitutes exceed 20% of the total structural cost, the pre-stressed concrete and structural steel are included in the assessment. If found the precast concrete volume more than 20% of structural concrete volume, the precast elements have to be assessed. Tensile strength of steel reinforcement and testing of compressive strength of concrete will be carried out on laboratory testing. Non-destructive testing of the uniformity and the cover of hardened concrete. (Building and Construction Authority (BCA), 2006) Appendix 1 shows the quality standards of Structural Works. Architectural Works The components and finishes are classified in Architectural Works. The workmanship and quality can be easily seen and found. Below are the details of assessment of Architectural Works:- After the building have complete, the assessment have to be carried out on roofs, external works, external walls and internal finishes. All the assessment have to be carried out on site. Internal walls, doors, components, windows and floors are classified under the internal finishes. Functional and material tests such as on external walls and adhesion of internal wall tiles and water-tightness of window. (Building and Construction Authority (BCA), 2006) Appendix 2 shows Architectural Works quality standard. Mechanical Electrical (ME) Works The progress of whole building will be influenced by ME Works. Air conditioning Mechanical Ventilation Works (ACMV), Electrical works, the basis ME fittings and Fire Protection Works are classified under the progress of the building. Below are the stage of assessment:- Concealed pipes, ACMV ductworks and electrical conduits are classified as installed works, the inspection on the item have to be carried out before embedded on site. The cooling tower, fire alarm control panel and Air-Handling Unit (AHU) are the final installed works which the assessment have to be carried out on site. Dry Riser Test, Earthing Test and Water Pressure Test are considered as selected works. The performance tests are carried out on them. (Building and Construction Authority (BCA), 2006) Appendix 3 show the quality standard of ME Works. The Weightages CAT A (Commercial, Industrial, Institution and Others), CAT B (Condominium, Institution and Others), CAT C (Public housing), and CAT D (Landed properties) are the four categories of building that distribute the weightages for ME Works, Architectural Works and Structural Works in CONQUAS 21 system. The objective of weightage system is making the quality of a building is based on the CONQUAS score, it is a compromise between the cost proportions of the three components in the various buildings and their aesthetic consideration (Building and Construction Authority (BCA), 2006). In general, ME works consist 10% for four categories of building in average, 35% is consisted by the Structural works and the highest percentage is consisted by Architectural works which 50% in average for the four categories of buildings. The quality of Architect works is the most important with the highest percentage, second is represented by the Structural works and ME works is the lowest. Table 2: The Weightages in CONQUAS 21 Components CAT A Commercial, Industrial, Institution Others CAT B Commercial, Industrial, Institution Others CAT C Public Housing CAT D Landed Properties Structural Works 30% 35% 45% 40% Architectural Works 50% 55% 50% 55% ME Works 20% 10% 5% 5% CONQUAS Score 100% 100% 100% 100% Note: In general, projects with central cooling system having cooling tower, chiller system, etc are classified under CAT A. Otherwise, it will be classified under CAT B. Appendix 5 provides a guides with listing of building under the various categories. Adapted from Building and Construction Authority (BCA): CONQUAS 21 manual book CONQUAS Assessor In CONQUAS 21 system, only the Building and Construction Authority (BCA) officer can be the assessor to inspect the works done of the project. BCA will conduct a calibration program and training for assessors to attend to ensure competency and consistency in the assessment (Building and Construction Authority, 2006). Furthermore, CONQUAS 21 system is consider as independent assessment. Therefore, if the building or parts of the building project are acceptable, the architects and engineers are not allowed to use CONQUAS to make any decision unless the building contract specify it (Building and Construction Authority (BCA), 2006). Sampling Sampling system is introduced in the CONQUAS 21 system for the assessment. It is impossible for us to inspect every unit of the works done. Thus, the sampling system is used for the assessment, it helps the accessor a lot by saving the time and make the assessment easier due to the samples will be randomly chosen by the assessor for inspection. Furthermore, the sampling system want to make sure the inspection is sufficient to represent the whole building by referring to the gross floor area of the building. The assessment of CONQUAS 21 Assessment approach Sampling system is used by the CONQUAS 21 as the assessment system, the sample will be randomly selected for the quality assessment according to the location plan and drawing plan and it will be distributed based on the construction stages (Building and Construction Authority (BCA), 2006). The scoring will be done on the works that are inspected for the first time because the objective of this practice is to encourage contractors doing things right the first time is the principle of the CONQUAS 21 system which want to make sure all the contractor do the works well and maintain the quality in first time. Thus, the scoring will not take into account for the rectification works, only the first time works done will be inspected and scored in the CONQUAS 21 system (Building and Construction Authority (BCA), 2006). In filling the assessment form, X mean the work done do not fulfill the CONQUAS quality standard after inspection on it. Instead, consider the inspected work have reached the quality standard stated in the CONQUAS system. Besides, not applicable item will be noted as - in the assessment form. The number of over the total number of item assessed is the final score of CONQUAS for the whole project. Structural works assessment After the whole projects have been completed, the inspection on structural works only can be done. Wall, slab, beam and column can be classified as the Structural works. Below show the details of the assessment of a reinforced concrete structure:- Table 3: The assessment of a reinforced concrete structure Reinforced Concrete Structure Weightage % Formwork 15 Rebar 20 Finished Concrete 25 Concrete Quality 5 Steel Reinforcement Quality 5 NDT UPV test for concrete uniformity 15 NDT Electro-Cover meter test for concrete cover 15 Total 100 *If total precast concrete volume exceeds 20% of total structural concrete volume, assessment will be carried out for precast concrete construction. The points will be distributed proportionately between formwork/rebar assessment and precast concrete assessment based on the respective concrete volume percentage. Adapted from Building and Construction Authority: CONQUAS 21 manual book The structural works assessment is carried out by using sampling system which mean only part of the samples have been chosen to represent whole project for the assessment, not every unit is inspected. Thus, there are some guidelines for the assessment of structural works. The guidelines are shown as below:- Table 4: Guidelines for Structural works assessment Items GFA per Sample Min Sample Max Sample Remarks 1 Structural Elements 500 m2 30 150 For Non-Housing Project 1a Strctural Elements 1500 m2 30 50 For Housing Project 2 Concrete Compressive Strength 100% Declaration by Qualified Person 3 Steel reinforcement Tensile Strength 100% Declaration by Qualified Person 4 NDT UPV test for concrete uniformity 5,000 m2 2 sets 20 sets 5 structure members per set 5 NDT Electro-Cover meter test for concrete cover 5,000 m2 2 sets 20 sets 5 structure members per set Note: The computed number of elements to be checked must be evenly distributed throughout the entire block and cover at least 50% of floors in a block. They should also as far as possible cover the different types of structural elements. Adapted from Building and Construction Authority: CONQUAS 21 manual book The inspection is only site inspection, the inspection cannot be done at precast yard due to all the structure works to be inspected is cast in-situ concrete works, not the precast component. The inspection of the structural works is according to compliance to the standards (see in the Appendix 1, 1a, 1b 1c). The further assessment will be required if the structural steelwork in the structural works exceed 20% of the structural cost and the points will be distributed proportionately. The Pre-stressing Works is similar with the str

Saturday, January 18, 2020

Language and Pragmatics Essay

Language is the common ground for everyone. It is the thing that links a society together because this is how they communicate and understand each other. It is common, therefore, that one culture can feel confused when dealing with other people from different cultures. This is due to the fact that even if they learn a certain language, they will still need to learn the culture of the people to be able to communicate properly. It is not enough that one learns the words. A person should be also knowledgeable of the ways certain words or phrases are used or what is proper or not to say during conversations for him or her to completely understand a particular culture. One of the things that I got interested in from the lecture was phatic communion, which is a â€Å"form of communication between people which is not intended to seek or convey information but has the social function of establishing or maintaining social contact. † This is very apparent in the American culture. People have the tendency to automatically ask how the other is doing and the other is expected to respond with just a simple answer. It is not meant to ask how a person is really feeling but it is just a polite way of acknowledging the person’s presence. I have experienced this form of communication since I started living in this country. It is hard to miss it because people use it everyday in the grocery store, at the mall, coffee shop, even at school. I can relate to the examples in the lecture notes because Spanish is my first language. I also had difficulty in learning the English language because of its complications like the phatic communion. At first, I thought that people were concerned about me and the things that are going on with my life. However, when I got used to the language, I came to realize that this was just some form of formality and that I am not expected to give a detailed response. Living in this country, I have also learned that it is not unusual for people to greet each other even if they are complete strangers. People say hello to each other when they pass them on the street. However, this is not being friendly for them. People have become accustomed to it and would feel uncomfortable if they did not acknowledge the other person. This is in contrast to other cultures where people would feel scared or uneasy if a stranger would say hello to them on the streets out of nowhere. They might think that the person has other intentions other than just to be polite. Personally, I think that people from different cultures talk fast because they are already used to the language and they have mastered it since the time they learned how to speak it. As such, fast-paced talking is not only applicable to the Americans but to everyone as well. Some cultures can only seem soft spoken because of their voices but they are still fast-paced if one listens carefully. Another interesting observation is the difference between men and women in terms of listening. As a woman, I can relate to the lecture notes where it is indicated that women tend to nod to show that they are listening to someone. I actually do this just to show appreciation to the speaker, especially when he or she is looking directly at me while speaking. It is a polite way of saying that I am listening although I may not be agreeing to what he or she is trying to say. This is different from what men do and I have noticed this in the way my husband reacts when someone is talking and he is in the audience. There is no indication that he is listening and will only be apparent when he nods his head in agreement with the speaker. I think that women’s reaction is better because if it were me speaking, I would like to know if my audience is listening or not even if they may not agree to what I have to say. It is encouraging to know that the audience is interested in my speech and that I am not being ignored. The last topic that I found interesting is the different ways on how to say no or refuse to someone. I agree with this because sometimes, people find it very difficult to say no in fear of offending the other person. As such, people find different ways to say no and this include offering an alternative, putting the blame on another, diverting the attention to another topic, or through postponement. Doing these things will make it easier to say no and will not make the other person feel bad about the situation. Personally, I do not have a hard time saying no to people, especially if I strongly feel that refusing is the right thing to do. However, it is still good to know how to say no indirectly because we have to realize that people react to things differently. One may be fine with accepting no for an answer while others may take this against you. I think that learning a language and the ways of a certain culture is essential in being able to communicate with the culture’s people effectively. This is the only for an outsider to become accepted and feel comfortable in using the language. It is also a way for a person to learn what is proper and what is unacceptable, which is important for some cultures because there are certain things that might offend them without the person even knowing. It can be said, therefore, that learning a second language is difficult, especially if the person learning it is not even living in the country or place where that language is being used. Exposure is needed for one to learn and acquire a culture’s language and customs. Without experiencing it first-hand, it is hard to practice the language and apply it to one’s everyday lives. It is also better to communicate with the people who use the language everyday so that the person can practice speaking it and using it much better. The person will be able to learn faster and easier if there is first-hand exposure.

Friday, January 10, 2020

Finding the Best Chicago Style Essay Samples

Finding the Best Chicago Style Essay Samples The Basic Principles of Chicago Style Essay Samples You Will be Able to Benefit From Beginning Today So that the reader can seek out the bit of information required, in a simple way. Apparently, you can't state the page quantity of a web-based source, and therefore you don't. There are several free on-line tools created to aid a student to create an ideal page for the cover. Include the internet address of the webpage. The Characteristics of Chicago Style Essay Samples The URL or DOI ought to be the previous portion of the citation. In case the website has a print counterpart, like the site for a newspaper, put the site title in italics. The title page isn't numbered. The very first page of text ought to be labeled page 2. Thefootnote text is put at the base of the page where there's the citation. A note could be added if a more formal citation is necessary. It is essential to be aware that annotated bibliographies also exist so far as Chicago style is concerned. Though useful, a bibliography isn't required in works that offer full bibliographic data in the notes. Footnotes are the list of citations utilized in 1 page that are located in the base of the webpage. They must appear at the bottom of the page that they are referred to. They appear at the bottom of the page they refer to. Footnotes might not be an essential characteristic of writing, but they might be exceedingly handy for reducing clutter without needing to excise important asides or explanations a practice that could be handy in academic writing and elsewhere too. Both use the exact same formatting guidelines. Chicago recommends including a bibliography in most court cases, which usually means you're usually only require short notes. Chicago style is extremely popular with college and university students. Naturally, it may have deviations, so it is better to check online examples in order to perfectly understand how to compose Chicago style essay. The Chicago style is principally employed for manuscript preparation and publication and could also. MLA Format cover page has to be made for every single report prepared by means of a university student. If desired, you ought to be in a position to locate a Chicago writing style template on the web, which you are able to use as a guide. You've been redirected to our new website. So, you can see web sites of essay writing companies and internet encyclopedias to be able to find any information on Chicago style you will need. Some lack the appropriate grasp of grammar and vocabulary to produce the guide. A great academic writing implies the use of quotations. The students from the many scholastic levels would normally be asked to compose various kinds of essays for their classes. While writing a personal narrative, you should concentrate on only one experience. A Thought on what engages your attention is a great place to begin from in figuring out how to compose a 5 paragraph writing. It is crucial to receive a Chicago style example which will function as a guide to writing own essay. This manner of writing is favored for research paper topics where the author should include extensive commentaries on parts of the text. Sample thesis is an excellent reference point for people who are writing thesis for the very first moment. This kind of essay is made on the grounds of an interview performed by the author of the paper. You should try and follow evocative writing while completing this kind of essay. Sample essay two sample essay. You may always use a good Chicago writing style template to ease the formatting approach. Chicago style isn't very hard to understand. however, it is extremely tough to read entire manual of the style. This sort of Chicago formatting style uses author's name and date as its name suggests. There are lots of key reference styles utilised in academic writing. If it's too long for only one line, you use the typical double spacing. You separate the webpage number with a comma, other than that there'll not be any punctuation. The footnote number should be put at the conclusion of the sentence or the conclusion of a clause in a sentence. Page numbers of the principal section.

Wednesday, January 1, 2020

Organizational Change Essays - 1078 Words

Organizational change can be intimidating for business leaders. The internet hosts several sites for small consulting firms that specialize in helping corporate leaders initiative positive change in their organizational culture. One such firm, Change Management Solutions, Inc., (CMS) uses a five-step change model, which encompasses contemporary collective and collaborative theories and models of change and change leadership. The firm considers culture, organizational leadership, and change planning as essential tools to prevent â€Å"becoming one of the 75% of businesses who fail at change.† (Puelo, n.d.) Similar to the design of the chapters in Hickman’s book, the CMS website promotes â€Å"Effective (change) plans answer the critical who,†¦show more content†¦Change leadership, defined as, the ability to energize groups who will be implements change projects that they may or may not fully embrace, or, the ability to understand the need for change and demonstrate a high tolerance for ambiguity and a positive attitude in the midst of change. (class lecture) CMS coaches leaders to use transformational change as well as transactional leadership to accomplish change. CMS starts sustainable change by using a five-step model similar to Schwartz or Koetter’s models for change ((Hickman, 2010) The five steps of the CMS change model are planning, leading, evaluating, handling change resistance, and avoiding and overcoming burnout. CMS states, â€Å"Planning change that becomes a part of the corporate culture requires planning that considers the effects of the change to all levels of employees.† (Puelo, n.d.) This is an example of empowerment and shared power concepts. Part of having shared power is creating a clear vision, developing others, and making empowerment systemic, all things CMS coaches their client organizations to embrace. (Hickman, 2010) Once change is planned, CMS implements a strategic change plan. This plan requires leaders, formal or informal, who will be trained and supported during change implementation. This type of leadership falls under the teleological theory of planned leadership with transformational l eadership and collective/collaborative leadership styles where power is shared by multipleShow MoreRelatedEssay on Organizational Change875 Words   |  4 PagesOrganizational Change Change can be a difficult transition however in the world of business whether it is planned or unplanned one can expect change to happen. The definition of change is, â€Å"the coordination of a structured period of transition from situation A to situation B in order to achieve lasting change within an organization†. (BNET Business Dictionary) How the change is accepted and adapted to can be the difference of success or failure of an organization. There are different types ofRead MoreOrganizational Change1506 Words   |  7 PagesChange Management Introduction A need for growth in any organization to stay a viable entity must occur. Organizational change is inevitable. Just like anything in life, markets and cultures change which require constant attention and preparation. In order to be successful in any market, an organization has to be able transform itself to the needs for the market. CrysTel is no stranger to change. CrysTel is a telecommunication company with over 2500 employees and a gross income of approximatelyRead MoreOrganizational Change1929 Words   |  8 PagesOrganizational Change Organizational Change Management is â€Å"all of the actions required for an organization to understand, prepare for, implement and take full advantage of significant change†. The goals of Change Management are: * The successful design, implementation, measurement and maintenance of an organization’s change initiative * Enhancement of their on-going capacity for managing change Lewin’s force field analysis model states that all systems have driving and restrainingRead MoreWhat Is Organizational Change?948 Words   |  4 PagesWhat is organizational change? This is a question that is imperative to know the answer to in order to fully understand today’s industry and workplaces. According to businessdictionary.com, organizational change is defined as a company or organization that is going through a transformation which can occur when business strategies or major sections of an organization are altered. In order for companies to succeed in altering their business in any way, they really must understand how important it isRead MoreOrganizational Change Is Significant To An Organization1011 Words   |  5 PagesOrganizational change is significant to an organization as it can change the success of an organization, remove specific job practices or functions, alter policies and procedures, and change the way an organization operates (managementhelp .org). Organizational change efforts should improve the performance of an organization as well as the people in the organization (Campbell, 2014). To begin an organizational change, a change agent should understand the culture of organization, which reflects inRead MoreQuestions On Managing Organizational Change890 Words   |  4 Pagesto Survive Organizational Changes in the Fast-Changing World As we have learned all quarter, managing the changing organizational environment is one of the most salient challenges in today’s business world. Managing organizational change properly can minimize resistance from employees and cost of and maximize the effectiveness of the changes. In other words, managing organizational change addresses the human side of the changing management. Personally, I think organizational changes are a greatRead MoreOrganizational Change And The Implementation Of The Change Essay1569 Words   |  7 PagesIntroduction: Organisational change and the implementation of the change is a relevant issue when analysing the Nora case. Organisation change is the ability of an organisation to change over time and is reliant on the ability of the organisation to change the individual behaviour of individual employees (Robertson, Roberts and Porras, 1993). Organisational change is a common occurrence in modern organisations and the change can come from new employees to new strategies. It is relevant in the caseRead MoreOrganizational Change And Change Management2278 Words   |  10 Pages Change Management in IT Environment Presented by Aravind Reddy Vootukuri Wilmington University 1) Abstract 2)Organizational Change During My Employment with Capgemini in 2007 a)Reasons for Change b)Objectives Set for this Change Program c)Used John kotter s8 step Change model d)Used Change Process 3)ChangeRead MoreOrganizational Change Is Inevitable?1736 Words   |  7 PagesOrganizational change is inevitable. In today’s ever-changing world there are many factors that can necessitate a need for change. Whether the change is needed because of evolving markets, new trends for products or customer demands, managers must identify when and where the change is needed. In order to ensure viability, productivity and ultimate success of an organization, it is essential that the type of change be identified and proper steps and procedures developed to manage change appropriatelyRead MoreOrganizational Change : An Organization1114 Words   |  5 PagesIntroduction Organizational change is a crucial issue exercised in an organization to increase performance as it works toward its ideal state. Organizational change arises as a reaction to an ever-changing environment, a response to an ongoing difficult situation, or is stimulated by a leader. Organizational change is a survival strategy. If the organization does not maintain the changing technology, consumer demands, and productive business activities, they will lose their competitive area. Forces